Monitoring the job

Check the Job Monitor as the job is running. When the analysis completes, its contents will look similar to Figure 1.

Figure 1. Job Monitor: original pipe vibration analysis.

Both steps are shown, and the time associated with the linear perturbation step (Step 2) is very small: the frequency extraction procedure, or any linear perturbation procedure, does not contribute to the general loading history of the model.