*HEADING ONE DIMENSIONAL WICKING PROBLEM, COUPLED *** UNITS: M, TON, SEC, KN *NODE,NSET=ALLN 1,0.,0. 3,.1,0. 101,0.,1. 103,.1,1. *NGEN,NSET=BOT 1,3,1 *NGEN,NSET=TOP 101,103,1 *NFILL,NSET=ALLN BOT,TOP,20,5 *NSET,NSET=LHS,GENERATE 1,101,5 *NSET,NSET=RHS,GENERATE 3,103,5 *NSET,NSET=POREP,GENERATE 1, 101, 10 3, 103, 10 *ELEMENT,TYPE=CPE4P,ELSET=BLOCK 1,1,3,13,11 *ELGEN,ELSET=BLOCK 1,10,10,1 *ELSET,ELSET=OUTE 1,3,5,7,9 *SOLID SECTION,ELSET=BLOCK,MATERIAL=CORE *MATERIAL,NAME=CORE *ELASTIC 50.,0. *DENSITY .1, *POROUS BULK MODULI ,2.E6 *PERMEABILITY,SPECIFIC=10. 3.7E-4, *SORPTION -100.,.04 -10.,.05 -4.5,.1 -3.5,.18 -2.,.45 -1.,.91 0.,1. *SORPTION,TYPE=EXSORPTION -100.,.09 -10.,.1 -8.,.11 -6.,.18 -4.5,.33 -3.,.79 -2.,.91 0.,1. *INITIAL CONDITIONS,TYPE=SATURATION ALLN,.05 *INITIAL CONDITIONS,TYPE=PORE PRESSURE POREP, -22.0, 1.0, -12.0, 0.0 *INITIAL CONDITIONS,TYPE=RATIO ALLN,5. *INITIAL CONDITIONS,TYPE=STRESS,GEOSTATIC BLOCK,-1.1,1.,-2.016666667,0.,0.,0. *EQUATION 2, 3,8,1.,1,8,-1. *BOUNDARY ALLN,1 BOT,2 *RESTART,WRITE,FREQUENCY=10 *STEP,INC=1 *GEOSTATIC 1.E-6,1.E-6 *BOUNDARY 1,8,,-12. *DLOAD BLOCK,GRAV,10.,0.,-1.,0. *NODE PRINT,FREQUENCY=5,NSET=LHS U,RF,POR,RVT *EL PRINT,FREQUENCY=5,POSITION=AVERAGED AT NODES S,E SAT,POR,VOIDR *NODE FILE,FREQUENCY=10,NSET=LHS U,RF,POR,RVT *EL FILE,FREQUENCY=10,ELSET=OUTE S,E SAT,POR,VOIDR *END STEP *STEP,INC=100 *SOILS,CONSOLIDATION,UTOL=20. 1.,1000000. *BOUNDARY 1,8,,0. *CONTROLS,ANALYSIS=DISCONTINUOUS *CONTROLS,PARAMETERS=FIELD,FIELD=DISPLACEMENT ,1., *CONTROLS,PARAMETERS=FIELD,FIELD=PORE FLUID PRESSURE ,1., *END STEP