*HEADING ONE DIMENSIONAL COUPLED DEMAND WETTABILITY, WITH GEL, QUADRATIC ELEMENTS *** UNITS: M, SEC, NEWTON *NODE,NSET=ALLN 1,0.,0. 3,.00508,0. 101,0.,8.55637e-2 103,.00508,8.55637e-2 *NGEN,NSET=BOT 1,3,1 *NGEN,NSET=TOP 101,103,1 *NFILL,NSET=ALLN BOT,TOP,20,5 *NSET,NSET=LHS,GENERATE 1,101,5 *NSET,NSET=RHS,GENERATE 3,103,5 *NSET,NSET=PORN,GENERATE 1,101,10 3,103,10 *ELEMENT,TYPE=CPE8RP,ELSET=BLOCK 1,1,3,13,11,2,8,12,6 *ELGEN,ELSET=BLOCK 1,10,10,1 *ELSET,ELSET=OUTE 1,3,5,7,9 ******************************************* *SOLID SECTION,ELSET=BLOCK,MATERIAL=CORE .02, *MATERIAL,NAME=CORE *ELASTIC 10000.,0. *POROUS BULK MODULI ,2.E9 *PERMEABILITY,SPECIFIC=10000. 3.7E-4, *SORPTION -100000.,.04 -10000.,.05 -4500.,.1 -3500.,.18 -2000.,.45 -1000.,.91 0.,1. *SORPTION,TYPE=EXSORPTION -100000.,.09 -10000.,.1 -8000.,.11 -6000.,.18 -4500.,.33 -3000.,.79 -2000.,.91 0.,1. *GEL .0005,.0015,1.E8,500. ********* *BOUNDARY BOT,2 ALLN,1 *RESTART,WRITE,FREQUENCY=10 *map solution, step = 2, unbalanced stress=step ******************************************* *STEP,INC=100,NLGEOM *SOILS,CONSOLIDATION,UTOL=10000. 1.,2000.,,300. *BOUNDARY 1,8,,-100. 3,8,,-100. *CONTROLS,ANALYSIS=DISCONTINUOUS *OUTPUT,FIELD *NODE OUTPUT,NSET=ALLN U,POR *ELEMENT OUTPUT,ELSET=BLOCK S,SAT,VOIDR,GELVR,POR *OUTPUT,HISTORY *NODE OUTPUT,NSET=LHS U,RF,POR,RVT *ELEMENT OUTPUT,ELSET=OUTE S22,POR,GELVR,SAT,VOIDR *END STEP