*HEADING ONE DIMENSIONAL COUPLED DEMAND WETTABILITY, WITH GEL *** UNITS: M, SEC, NEWTON *NODE,NSET=ALLN 1,0.,0. 3,.00508,0. 101,0.,.0508 103,.00508,.0508 *NGEN,NSET=BOT 1,3,1 *NGEN,NSET=TOP 101,103,1 *NFILL,NSET=ALLN BOT,TOP,20,5 *NSET,NSET=LHS,GENERATE 1,101,5 *NSET,NSET=RHS,GENERATE 3,103,5 *ELEMENT,TYPE=CPE4PH,ELSET=BLOCK 1,1,3,13,11 *ELGEN,ELSET=BLOCK 1,10,10,1 *ELSET,ELSET=OUTE 1,3,5,7,9 *NSET,NSET=PORN,GENERATE 1,101,10 3,103,10 ************************************************ *SOLID SECTION,ELSET=BLOCK,MATERIAL=CORE .02, *MATERIAL,NAME=CORE *ELASTIC 10000.,0. *POROUS BULK MODULI ,2.E9 *PERMEABILITY,SPECIFIC=10000. 3.7E-4, *SORPTION -100000.,.04 -10000.,.05 -4500.,.1 -3500.,.18 -2000.,.45 -1000.,.91 0.,1. *SORPTION,TYPE=EXSORPTION -100000.,.09 -10000.,.1 -8000.,.11 -6000.,.18 -4500.,.33 -3000.,.79 -2000.,.91 0.,1. *GEL .0005,.0015,1.E8,500. ************************************************ *INITIAL CONDITIONS,TYPE=SATURATION ALLN,.05 *INITIAL CONDITIONS,TYPE=PORE PRESSURE PORN,-10000. *INITIAL CONDITIONS,TYPE=RATIO ALLN,5. *BOUNDARY BOT,2 ALLN,1 *RESTART,WRITE,FREQUENCY=10 ************************************************ ** *STEP *SOILS,CONSOLIDATION 1.E-7,1.E-7 *DLOAD 10,P3,-500. *CONTROLS,ANALYSIS=DISCONTINUOUS *NODE PRINT,FREQUENCY=5,NSET=LHS U,RF,POR,RVT *EL PRINT,FREQUENCY=5,ELSET=OUTE S,E SAT,POR,GELVR,VOIDR *NODE FILE,FREQUENCY=1,NSET=LHS U,RF,POR,RVT *EL FILE,FREQUENCY=1,ELSET=OUTE S,E SAT,POR,GELVR,VOIDR *OUTPUT,FIELD, Frequency=100 *NODE OUTPUT,NSET=LHS U,POR *ELEMENT OUTPUT,ELSET=OUTE S,SAT,VOIDR *OUTPUT,HISTORY,Frequency=5 *NODE OUTPUT,NSET=LHS U,RF,POR,RVT *ELEMENT OUTPUT,ELSET=OUTE S22,POR,GELVR *END STEP ************************************************ *STEP,INC=100,NLGEOM *SOILS,CONSOLIDATION,UTOL=10000. 1.,3000.,,300. *BOUNDARY 1,8,,-100. 3,8,,-100. *END STEP